As part of 91Å®Éñ's ongoing garage repairs, work will be taking place in Hickory West garage, beginning with a closure of the affected area on Wednesday, Aug. 14, 2024.

The area of work will be on the middle ramp of Hickory West garage ( connecting level 2 to level 3) including at the top and bottom of the ramp. This work area will be done in multiple phases to allow continuous access to all levels of the garage.

Safety is 91Å®Éñ's number one priority and so the immediate work area as well as parking adjacent to the work area will be blocked during the work. Again, the contractor will be phasing this work in order to allow for continuous use of all levels of the garage to minimize disruptions. The planned phases will occur in the following order:

 â¶Ä‚â¶Ä‚â¶Ä‚â¶Ä‚â¶Ä‚1´¡
 â¶Ä‚â¶Ä‚â¶Ä‚â¶Ä‚â¶Ä‚1µþ
 â¶Ä‚â¶Ä‚â¶Ä‚â¶Ä‚â¶Ä‚2´¡
 â¶Ä‚â¶Ä‚â¶Ä‚â¶Ä‚â¶Ä‚2µþ

The entire project is estimated to take 2 to 4 months. 91Å®Éñ Construction Services apologizes for any inconvenience this causes as we work to maintain and improve our campus structures.

Phase 1A

Phase 1A of the work will be the first portion of the garage done. Temporary driving lanes are marked with green arrows while the red box marks the area that will be closed. 91Å®Éñ Photo.

Phase 1A of the work will be the first portion of the garage done. Temporary driving lanes are marked with green arrows while the red box marks the area that will be closed. 91Å®Éñ Photo.

 

Phase 1B

Crews will move onto Phase 1B second. Temporary driving lanes are marked with green arrows while the red box marks the area that will be closed. 91Å®Éñ Photo.

Crews will move onto Phase 1B second. Temporary driving lanes are marked with green arrows while the red box marks the area that will be closed. 91Å®Éñ Photo.

Phase 2A

Phase 2A will feature a shift of the clsoed area. Temporary driving lanes are marked with green arrows while the red box marks the area that will be closed 91Å®Éñ Photo.

Phase 2A will feature a shift of the clsoed area. Temporary driving lanes are marked with green arrows while the red box marks the area that will be closed 91Å®Éñ Photo.

 

Phase 2B

Phase 2B

The last scheduled phase is Phase 2B. Temporary driving lanes are marked with green arrows while the red box marks the area that will be closed. 91Å®Éñ Photo.